YEAR: 1995
COUNTRY: Argentina
PLACE: Province of Neuquén
CLIENT: Total Austral S.A.

OUR CONTRIBUTION

Type of job:

Management and supervision of geotechnical and the topography of the pipleline project and the processing plant called Aguada Pichana. Hydrological studies.

Brief description:

Central Processing Plant (CPF), four (4) cluster sites, three (3) trunk lines about eight (8) to ten (10) miles in length, carrying natural gas, forty (40) miles of pipeline transporting the processed gas and forty (40) miles radio lines. 150 km northwest Neuquen City, near the town of Añelo. Preparation of specifications for surveying and geotechnical investigations, call for tenders for the adjudication of works and management and supervision thereof. Control of work completion, work control testing, measurement and certification. Reception of jobs. Running water studies in seven alluvial basins and in Lower Añelo, flood analysis in the Neuquén River, downstream from Portezuelo Grande, and recommendations for bed erosion channels.

Latinoconsult SA - Suipacha 1067 - (1008) Buenos Aires, Argentina -  Phone: +(5411) 4313 5431 - Fax. (5411) 4313 4718 - This email address is being protected from spambots. You need JavaScript enabled to view it. - ALL RIGHTS RESERVED.
Sitio web optimizado para las versiones más recientes de Chrome, IE, Firefox, Safari y Opera.
Si su navegador se encuentra desactualizado es posible que no le permita visualizar todas las características de ésta u otras webs.