YEAR: 2006-2008 
COUNTRY: Argentina
PLACE: Province of Formosa
CLIENT: Industrial y Constructora S.A.-J.C.R. S.A.

OUR CONTRIBUTION

Type of job:

Potable Water Supply System optimization -  Formosa City.

Brief description:

The works consisted of a Water intake work, a raw water aqueduct of 1200 mm diameter PRFV and a Water Treatment Plant of the following characteristics: The intake water work is a reinforced concrete structure, located on the Río Paraguay to approximately 300 m downstream from the mouth of the Riacho El Mirador. The structure consists of a channel that feeds adduction 4 pumps located at the end of a total capacity equal to 1710 m³ / ha to 30 m tall. The raw water pipeline of 2.5 km, communicates with the Feed Water Treatment Plant. Treatment Plant has a production capacity of 147,600 m³ / day. The design developed as anticipated treatment units: mechanical Flocculators, Flat Sediments Filters and dual fast plates.

Latinoconsult SA - Suipacha 1067 - (1008) Buenos Aires, Argentina -  Phone: +(5411) 4313 5431 - Fax. (5411) 4313 4718 - This email address is being protected from spambots. You need JavaScript enabled to view it. - ALL RIGHTS RESERVED.
Sitio web optimizado para las versiones más recientes de Chrome, IE, Firefox, Safari y Opera.
Si su navegador se encuentra desactualizado es posible que no le permita visualizar todas las características de ésta u otras webs.