Transportation

Water management

Hydraulics

Power

Environment

Manufacturing

Health infrastructure

Agriculture

Urban Infrastructure

YEAR: 2010 - 2014 
COUNTRY: Argentina
PLACE: Province of Santa Cruz
CLIENT: Comité de Administración del Fondo Fiduciario para el Transporte Eléctrico Federal (CAF)

OUR CONTRIBUTION

Type of job:

Technical assistance services and inspection of works, equipment and materials.

Brief description

Construction of: 1) ET ​​- Esperanza 500/220/132 kV. Construction of a new transformer station. 2) LEAT 220 kV line. Line between New ET Esperanza - New ET Río Gallegos, about 128 km. 3) ET 220/33 Kv Rio Gallegos. Construction of a new transformer station. 4) LAT 220 kV line. Line between ET Esperanza - ET of the Coal Power Plant in Rio Turbio, about 149 km. 5) LAT 132 kV line. Line of approximately 159 km. Between ET Esperanza and ​​ET El Calafate. 6) El Calafate 132/33/13.2 kV. Construction of a new transformer station.

Latinoconsult SA - Suipacha 1067 - (1008) Buenos Aires, Argentina -  Phone: +(5411) 4313 5431 - Fax. (5411) 4313 4718 - This email address is being protected from spambots. You need JavaScript enabled to view it. - ALL RIGHTS RESERVED.
Sitio web optimizado para las versiones más recientes de Chrome, IE, Firefox, Safari y Opera.
Si su navegador se encuentra desactualizado es posible que no le permita visualizar todas las características de ésta u otras webs.