Transportation

Water management

Hydraulics

Power

Environment

Manufacturing

Health infrastructure

Agriculture

Urban Infrastructure

YEAR: 2007-2008 
COUNTRY: Argentina
PLACE: Province of Santa Cruz
CLIENT: Private client

OUR CONTRIBUTION

Type of job:

La Barrancosa hydroelectric use.

Brief description:

Latinoconsult implemented the project of the hydroelectric complex located in the Santa Cruz River, 185 km from its estuary on the Atlantic Ocean. The hydroelectric complex project La Barrancosa is part of the comprehensive exploitation of the river Santa Cruz. The ravine, with a hydraulic jump of 34 m and a reservoir of 25,000 ha, will have an installed capacity of 600 MW and an average annual generation of 1,750 GWh

Latinoconsult SA - Suipacha 1067 - (1008) Buenos Aires, Argentina -  Phone: +(5411) 4313 5431 - Fax. (5411) 4313 4718 - This email address is being protected from spambots. You need JavaScript enabled to view it. - ALL RIGHTS RESERVED.
Sitio web optimizado para las versiones más recientes de Chrome, IE, Firefox, Safari y Opera.
Si su navegador se encuentra desactualizado es posible que no le permita visualizar todas las características de ésta u otras webs.