YEAR: 1992-1993 
COUNTRY: Argentina
PLACE: Provinces of Santa Cruz and Tierra del Fuego
CLIENT: Total Austral S.A.

OUR CONTRIBUTION

Type of job:

Project review and supervision of the works of the Exploitation of hydrocarbons in the Cuenca Austral Ara/Cañadón Alfa.

Brief description: 

a) The Huemul Project: Crude treatment to meet the required specifications in Pico Truncado (YPF): 3,000 m³ / day of crude oil processed to a specification of 0.5% BSW. Treatment of oily water to be suitable for reinjection: 5,000 m³ / day of treated water. Measuring oil volume in Pico Truncado. Auxiliary Services. Fuel gas. Anti fire network extension. Construction of a new 10 MVA transformer substation. b) Cañadón Alfa Project: New gas treatment plant with a capacity of 4,000,000 m³ / day and forecast to reach a maximum capacity of 6.7 million m³ / day. New compression facilities for medium pressure (MP) with a capacity of 7,000,000 m³ / day, which will raise the pressure of 36 kg / cm ² to 73.5 kg / cm ². Expansion of services, to reach the new total capacity of the plant. Underground power line from Rio Cullén. Fire Services: tanks, pumps and network.  Waste Gases Burn System. Drainage system. New gas pipelines (3,000 m of 10 ").

Latinoconsult SA - Suipacha 1067 - (1008) Buenos Aires, Argentina -  Phone: +(5411) 4313 5431 - Fax. (5411) 4313 4718 - This email address is being protected from spambots. You need JavaScript enabled to view it. - ALL RIGHTS RESERVED.
Sitio web optimizado para las versiones más recientes de Chrome, IE, Firefox, Safari y Opera.
Si su navegador se encuentra desactualizado es posible que no le permita visualizar todas las características de ésta u otras webs.