Transportation

Water management

Hydraulics

Power

Environment

Manufacturing

Health infrastructure

Agriculture

Urban Infrastructure

YEAR: 2007-2008 
COUNTRY: Argentina
PLACE: Province of Santa Cruz
CLIENT: Private client

OUR CONTRIBUTION

Type of job:

Cóndor Cliff hydroelectric use.

Brief description:

Latinoconsult implemented the project of the hydroelectric complex located in the Santa Cruz River, 250 km from its estuary on the Atlantic Ocean. The Condor project of the hydroelectric complex Cliff is part of the comprehensive exploitation of the river Santa Cruz. Condor Cliff, with a hydraulic jump of 64 m and a surface reservoir of 41,600 ha, shall have an installed capacity of 1,140 MW and an average annual generation of 3,380 GWh.

 

Latinoconsult SA - Suipacha 1067 - (1008) Buenos Aires, Argentina -  Phone: +(5411) 4313 5431 - Fax. (5411) 4313 4718 - This email address is being protected from spambots. You need JavaScript enabled to view it. - ALL RIGHTS RESERVED.
Sitio web optimizado para las versiones más recientes de Chrome, IE, Firefox, Safari y Opera.
Si su navegador se encuentra desactualizado es posible que no le permita visualizar todas las características de ésta u otras webs.