Transportation

Water management

Hydraulics

Power

Environment

Manufacturing

Health infrastructure

Agriculture

Urban Infrastructure

YEAR: 2009-2013 
COUNTRY: Argentina
PLACE: Province of Buenos Aires
CLIENT: Odebrecht-Cartellone-Supercemento-Roggio - UTE

OUR CONTRIBUTION

Type of Job:

Final design, detailed engineering and technical assistance for the construction of the North Area Purification System.

Brief description:

The North Area Purification System is a work whose aim is to provide drinking water to a population of 4,000,000 inhabitants of the North Area of Greater Buenos Aires, in AYSA’s area. The works consist of: a) 2 intake works, b) 1 tunnel 16 km in length and 3,600 mm in diameter, c) 1 water treatment plant with capacity of 900,000 m³ / d, d) 2 pumping stations with large scale e ) 3 Aqueduct. Amount of projected work: U$S 628,407,461

Latinoconsult SA - Suipacha 1067 - (1008) Buenos Aires, Argentina -  Phone: +(5411) 4313 5431 - Fax. (5411) 4313 4718 - This email address is being protected from spambots. You need JavaScript enabled to view it. - ALL RIGHTS RESERVED.
Sitio web optimizado para las versiones más recientes de Chrome, IE, Firefox, Safari y Opera.
Si su navegador se encuentra desactualizado es posible que no le permita visualizar todas las características de ésta u otras webs.