Transportation

Water management

Hydraulics

Power

Environment

Manufacturing

Health infrastructure

Agriculture

Urban Infrastructure

YEAR: 2010-2014 
COUNTRY: Argentina
PLACE: Province of Chaco
CLIENT: Unidad Ejecutora del Programa (UEP) de la Unidad de Coordinación de Programas y Proyectos con Financiamiento Externo (UCPyPFE) del Ministerio de Planificación Federal, Inversión Pública y Servicios de la Nación

OUR CONTRIBUTION

Type of job:

Optimization and Extension of the new drinkable water plant called "Planta Nueva Resistencia".

Brief description:

Nueva Resistencia Plant is located upstream of Puerto Barranqueras (Province of Chaco). Optimization Works and Water Treatment Plant Expansion is divided into four main groups: intake works, water treatment plant, pumps and blowers, remote management and control system. The existing plant facilities were designed for a potable water flow of 3,000 m³ / h currently treats raw water flow of 3,400 m³ / h, with peaks of 3,600 m³ / h to meet demand. These facilities will be optimized and expanded to produce a water flow of 6,000 m³ / h.

Latinoconsult SA - Suipacha 1067 - (1008) Buenos Aires, Argentina -  Phone: +(5411) 4313 5431 - Fax. (5411) 4313 4718 - This email address is being protected from spambots. You need JavaScript enabled to view it. - ALL RIGHTS RESERVED.
Sitio web optimizado para las versiones más recientes de Chrome, IE, Firefox, Safari y Opera.
Si su navegador se encuentra desactualizado es posible que no le permita visualizar todas las características de ésta u otras webs.