Name: Executive Project, Detail Engineering, and Technical Assistance for the Construction of the North Area Water Treatment System
Brief description: The objective of the project was to provide potable water to a population of 4,000,000 inhabitants. The works consisted of: a) 2 Water Intake Works; b) 1 Tunnel, 16 km in length and Ø 3,600 mm; c) 1 Water Treatment Plant with a capacity of 900,000 m³/day; d) 2 Large-scale Pumping Stations; and e) 6 Aqueducts.

Location: Province of Buenos Aires, Argentina.
Year: 2009-2016
Client: Odebrecht-Cartellone-Supercemento-Roggio – JV (Joint Venture)