Unidad Coordinadora de Programas con Financiación Externa (U.C.P.F.E.) – Proyecto de Infraestructura Hídrica del Norte Grande
-
Country
Argentina
-
Location
Pcia. de Chaco
-
Area
Water Management
-
Year
2014-2022
Type of Work: Project Review and Construction Supervision.
The purpose of the work is to satisfy the demand for drinking water in a large area in the north of the Province of Chaco called “El Impenetrable”. The works to be carried out are: – Capture in the Bermejo River by means of a floating pontoon in the Pintado; – Raw water conduction until pre-treatment 90 m pipe A ° Ø 500 mm; – Aqueduct of pre-sedimentation water to Wichí HDPE D. 500 mm, length 7,713 m; – Elevator Station to the treatment plant in Wichí and to the Nueva Pompeya Mission, pumping capacity: 0.77 m³ / sec; – Treatment plant with slow filters in Wichí to supply Wichi and El Sauzal and complementary works. The hydroelectromechanical work has 13,500 m³ of concrete. The work includes reviewing the Contractor’s socio-environmental Management Plan and monitoring its implementation.