Óscar and Juan Gálvez Racetrack

Project Name: Construction Inspection for the Óscar and Juan Gálvez Racetrack

Brief Description: The primary objective of this redevelopment is to restore the circuit’s international competitiveness and enable its return as a host venue for top-tier events, such as Formula 1, MotoGP, and the World Endurance Championship.

In this capacity, the project involves reviewing the engineering and supervising the construction work—ensuring technical oversight, compliance with international standards, and proper execution—thereby establishing the Óscar and Juan Gálvez Racetrack as a regional benchmark for motorsport.

Location: Autonomous City of Buenos Aires, Argentina

Year: 2026

Client: AUSA – Autopistas Urbanas S.A.

Lighting for General Paz Avenue and Riccheri Highway

Project Name: Upgrading of Lighting Towers at the Interchange of Riccheri Highway and General Paz Avenue

Brief Description: Engineering review and supervision of construction work for the foundations of new lighting towers, as well as their installation at the interchange of Riccheri Highway and General Paz Avenue. The 16 existing towers are being replaced by new 28.50-meter-tall towers, supported by direct foundations.

Location: Province of Buenos Aires, Argentina

Year: 2025

Client: Obrelectric S.R.L.

Alicurá, El Chocón, and Arroyito Hydroelectric Complexes (Due Diligence)

Arroyito
El Chocón
Alicurá

Name: Technical Due Diligence for the Alicurá, El Chocón, and Arroyito Hydroelectric Complexes

Brief Description: The service consisted of a comprehensive technical and economic evaluation (“due diligence”) of the Alicurá (1,050 MW), El Chocón (1,200 MW), and Arroyito (127 MW) power plants for a new 30-year concession period. The work included a document audit, technical site visits to the infrastructure, and the updating of hydrological models under climate change scenarios. Critical components—such as dams, electromechanical equipment, electrical systems, and substations—were evaluated. A “red flag” system was used to categorize regulatory and operational risks, enabling the early identification of critical findings. The technical scope informed financial deliverables, providing inputs for CAPEX and OPEX estimates, as well as availability projections and rehabilitation schedules.

Location: Provinces of Río Negro and Neuquén, Argentina

Year: 2025

Client: Genneia S.A.

La Dorada–Chiriguaná railway corridor

Name: Technical, economic, financial, accounting, legal, social, land-related, environmental, network, administrative, insurance, risk, operational, and logistical oversight—including commercial operation, maintenance, revenue collection and metering, quality management, document management, and contract monitoring—for a public-private partnership (PPP) concession agreement resulting from the bidding process for the railway corridor between the municipalities of La Dorada and Chiriguaná.

Brief description: The primary objective of the La Dorada–Chiriguaná railway corridor project is the rehabilitation and improvement of railway infrastructure, the construction of the logistical infrastructure required to enhance and consolidate freight transport services from La Dorada (Caldas) to Chiriguaná (Cesar), as well as the preparation, maintenance, and operation of the project’s rolling stock.

Location: Municipalities of La Dorada and Chiriguaná, Colombia

Year: 2025-2031

Client: ANI (National Infrastructure Agency)

San Martín Master Plan Update

Name: Infrastructure for the New San Martín Development Master Plan

Brief description: The scope included the preparation of the preliminary infrastructure design and the tender-ready design for the trunk utility networks that define the superblocks of the new San Martín development (the “NIUBA” project). It also encompassed the coordination of service feasibility assessments for the Master Plan with the relevant utility providers and regulatory authorities.

Location: Province of Buenos Aires, Argentina

Year: 2025-2026

Client: ECIPSA-Quality Invest S.A.

Drinking water, sewerage, and wastewater treatment in Sayán

Name: Supervision of the preparation of the technical dossier for the “Improvement and expansion of drinking water, sewerage, and wastewater treatment services in the Cercado de Sayán, the housing associations Villa Sol, Cruz del Jirón Portachuelo, and Trabajando por el Futuro de Portachuelo—covering 4 localities in the Sayán District.”

Brief description: The work consists of supervising the preparation of the technical dossier for the improvement and expansion of water and sanitation systems in the Sayán District. The project includes the following components: drinking water networks; sanitary sewer networks; a pumping station, a force main, and an outfall; a treatment plant featuring an Upflow Anaerobic Sludge Blanket (UASB) reactor; three secondary stabilization lagoons; and three tertiary stabilization lagoons. The tasks also include reviewing the social and environmental impact study.

Location: Sayán District, Huaura Province, Lima Department

Year: 2024

Client: National Urban Sanitation Program (PNSU) – Ministry of Housing, Construction, and Sanitation

Mantaro Hydroelectric Complex

Name: Technical supervision assistance for the execution of the Priority Interventions project at the Santiago Antúnez de Mayolo and Restitución hydroelectric power plants.

Brief description: The scope of the contract includes the supervision of detailed engineering for instrumentation, control, and SCADA systems for the modernization works at the Mantaro Hydroelectric Complex.

The complex consists of:

  • Santiago Antúnez de Mayolo Hydroelectric Power Plant. Capacity: 798 MW
  • Restitución Hydroelectric Power Plant. Capacity: 210 MW

Location: Tayacaja Province, Huancavelica Department; it is the largest such complex in the Republic of Peru.

Year: 2024

Client: AFRY Perú

Aña Cua Hydroelectric Power Plant Inspection

Name: Inspection of civil works, assembly, and commissioning of hydromechanical and electromechanical equipment for the expansion of the Yacyretá hydroelectric plant on the left bank of the Aña Cuá branch.
Brief description: Execution of all tasks inherent to the inspection, certification of progress, quality management, industrial safety, and other aspects of the expansion works of the Yacyretá hydroelectric plant in the Aña Cuá branch.


Location: Left bank of the Aña Cuá branch of the Paraná River. Border between Argentina and Paraguay.
Year: 2020-2026
Client: Entidad Binacional Yacyretá (EBY)

Mitre Railway Viaduct

Name: Preliminary design and technical environmental impact study for an elevated railway viaduct on the FC Mitre tracks (Tigre branch).
Brief description: The project proposes integrating the volume of the viaduct into the urban space. The current Lisandro de la Torre and Belgrano C stations will need to be developed at a high level, including the corresponding building modifications. The elimination of level crossings will allow for an increase in the speed and frequency of the trains.
Location: Autonomous City of Buenos Aires, Argentina.
Year: 2015-2016
Client: Subsecretaría de Transporte. Gobierno de la Ciudad de Buenos Aires.

Puerto Madero Urbanization

Name: Executive project and construction management and inspection of the service infrastructure for stage C (east sector) of the Antiguo Puerto Madero urbanization.
Brief description: The project was developed for an urbanization in an area of approximately 30 ha, located east of Docks 1, 2, 3, and 4 of the old Puerto Madero. It included pavements, horizontal and vertical demarcation and light signaling, potable water, sewage and storm drains, medium and low voltage electrical energy, natural gas, telephone, cable television, data transmission, and public lighting. Total population: 115,000 inhabitants.


Location: Autonomous City of Buenos Aires, Argentina.
Year: 1997-2002
Client: Corporación Antiguo Puerto Madero S.A.