Name: Technical Due Diligence for the Alicurá, El Chocón, and Arroyito Hydroelectric Complexes
Brief Description: The service consisted of a comprehensive technical and economic evaluation (“due diligence”) of the Alicurá (1,050 MW), El Chocón (1,200 MW), and Arroyito (127 MW) power plants for a new 30-year concession period. The work included a document audit, technical site visits to the infrastructure, and the updating of hydrological models under climate change scenarios. Critical components—such as dams, electromechanical equipment, electrical systems, and substations—were evaluated. A “red flag” system was used to categorize regulatory and operational risks, enabling the early identification of critical findings. The technical scope informed financial deliverables, providing inputs for CAPEX and OPEX estimates, as well as availability projections and rehabilitation schedules.
Location: Provinces of Río Negro and Neuquén, Argentina
Year: 2025
Client: Genneia S.A.