Hospitals: Fernández

Name: Supervision of maintenance and complementary works at the Juan Antonio Fernández General Acute Care Hospital.
Brief description: The works included the rehabilitation and improvements of the hospital. It is built on a 7,500 m² plot of land and has 25,000 m² of built-up space. It has a capacity of 276 beds. The company performed the engineering review; planning and management control; construction supervision, contract administration, and report preparation.

Location: Autonomous City of Buenos Aires, Argentina.
Year: 1992-1994
Client: Municipalidad de la Ciudad de Buenos Aires

Hidrovía Technical Feasibility Study – Economic

Name: Preparation of the bidding documents for the next concession period of the trunk waterway system for dredging, beaconing, and waterway maintenance works.
Brief description: The assignment consisted of preparing the bidding documents and technical specifications for the concession of engineering works and services for the new waterway (Santa Fe-Oceano section). The specialties included, among others: dredging, channel layouts, channel widths and reference levels, dredging and emptying/discharging areas, signaling, etc.

Location: Provinces of Buenos Aires, Entre Ríos, and Santa Fe, Argentina.
Year: 2024-2025
Client: Bolsa de Comercio de Rosario – Cámara de Puertos Privados Comerciales.

Preliminary Draft of the Arroyo Vega basin

Name: Adaptation of the preliminary draft of the water management master plan for the City of Buenos Aires for the Vega Arroyo watershed using TBM-EPB tunnel boring machines.
Brief description: Preparation of the bidding documentation for the works. Modification of the last section of the Monroe spillway, from the intersection of Monroe Street and Húsares Street to the bridge under the Belgrano railway tracks, defining sections, construction methodologies, and structures, with the scope of the executive project.

Location: Autonomous City of Buenos Aires.
Year: 2012-2013
Client: Ministerio de Desarrollo Urbano, Subsecretaría de Proyectos de Urbanismo, Arquitectura e Infraestructura (GCBA).

Railway Belgrano: Monje – Timbúes

Name: Review of the executive project and inspection of the complete renovation of the track infrastructure of the General Belgrano Railway (Branch F1, Section: Monje to Timbúes).
Brief description: The main tasks included supervising the cleaning and preparation of the area, removing and grading the existing track, and preparing the site for the new installation. The new narrow gauge track structure was then assembled, using long welded rails, concrete sleepers, and elastic fasteners. The project included the renovation of track switches and level crossings, the reconditioning of used rails, and monitoring of the contractor’s socio-environmental management plan.

Location: Province of Santa Fe, Argentina.
Year: 2011-2019
Client: Administración de Infraestructuras Ferroviarias S.E. (ADIFSE)

Exploitation of Hydrocarbons Cuenca Austral Ara – Cañadón Alfa

Name: Project review and supervision of hydrocarbon exploitation works in the Southern Ara Basin – Cañadón Alfa.
Brief description: El Huemul Project: Crude oil treatment to meet 3,000 m³/day for a 0.5% BSW specification. Oily water treatment to be suitable for reinjection at 5,000 m³/day. Crude oil volume measurement at Pico Truncado. Auxiliary services. Fuel gas. Extension of the fire network. Construction of a new 10 MVA transformer substation.
Cañadón Alfa Project: New gas treatment plant, with a capacity of 4,000,000 m³/day and planned to reach a maximum capacity of 6,700,000 m³/day. New medium pressure (MP) compression facilities with a capacity of 7,000,000 m³/day. m³/day, which will increase the pressure to 73.5 kg/cm². Services expansion to reach the plant’s new full capacity. Underground power line from the Cullén River. Firefighting services: tanks, pumps, and network. Waste gas flaring system. Drainage system. New gas pipelines (3,000 m of 10″ diameter).
Location: Santa Cruz and Tierra del Fuego Provinces, Argentina.
Year: 1992-1993
Client: Total Austral S.A.

Drinking water for the cities of La Ceiba, El Progreso and Puerto Cortés

Name: Drinking Water for the Cities of La Ceiba, El Progreso, and Puerto Cortés
Brief Description: Executive projects for the cities of La Ceiba and Puerto Cortés (Project estimate: 160,000 inhabitants): Population and consumption studies. Selection of supply sources (surface and underground), chemical and bacteriological analysis. Topography. Preliminary design of the intake and conveyance works, water treatment systems, distribution network, and storage reserves. Documents, calculations, budgets, and technical documentation for the call for bids.

Technical direction and inspection of works for the cities of La Ceiba, Puerto Cortés, and El Progreso.
Includes the purification of water from surface sources for a future population of 240,000 inhabitants served by the works. In La Ceiba and Puerto Cortés, these included: Surface water intake works from the river, station Lift, water treatment plant, pipelines, storage tanks, and distribution networks (capacity of 0.540 m³/s).
In El Progreso, these included: well field, pipelines, storage tank, and distribution network.

Location: Honduras
Year: 1976-1977; 1980-1984
Client: Servicio Autónomo Nacional de Acueductos y Alcantarillados (SANAA)

Nueva Costa del Plata Urbanization

Name: Urban redevelopment Avellaneda-Quilmes.

Brief description: The work included determining the technical pre-feasibility of the works to be developed for the infrastructure services of potable water, sewage, electricity, and gas. The total intervened surface was 2,317,700 m² out of a total area of 1,841,925 m².

Location: Province of Buenos Aires, Argentina.

Year: 2008

Client: Oficina Urbana S.A.

Modernization of Subway Line “A”

Type of work: Supervision, project review and coordination of the following civil works contracts and equipment supply and installation contracts:

a) Total renovation of tracks and track devices, 

b) Civil works (ventilation, fire-fighting and emergency lighting systems; pumping wells; escalators, conditioning of stations and service elevators suitable for the disabled),

c) electrical installations and 3 rectifying transformer stations,

d) signaling and radio communications.

Waste Management Jujuy

Type of Work: Solid Waste Master Plan, Institutional Strengthening, Integral Social Plan and Executive Projects 

Specific engineering consulting services in reference to the comprehensive management of solid waste, institutional strengthening and comprehensive social plan for waste, in the province of Jujuy, including the provision of multidisciplinary expert profiles required according to the Bank’s award contract. European Investment Fund (EIB). Benefited population: approximately 800,000 inhabitants including tourists who visit the region. The will also include the analysis of producing renewable energy from non-fossil raw materials and recovery of landfills that generate greenhouse gases.

Urbanization of Solares de Santa María

Type of work: Preliminary project and technical assistance.

Urbanization of a plot of 72 ha approx. located on the Costanera Sur (former Sports City of Boca Juniors). It is a project with a residential profile and mixed uses (shops, offices, hotels, sports and nautical clubs, supermarkets and parking lots). It contemplates the transfer of 358,000 m2 of land for public parks ranging from 30 m wide to 130 m, thus adding more than 90,000 m², trunk boulevards, transfers of all plots of water to public use, which could be used as future moorings. At the same time, a pedestrian promenade starts from the edge of the Costanera Sur and borders the entire river on its north bank that borders the Ecological Reserve, it extends like a boardwalk through the central sector of shops in the shape of a “horseshoe” and then through the public parks that, like a ribbon, end on the river front and return to the Avenida de la Costanera Sur.