Name: Detailed engineering of the civil works for the Piedra del Águila hydroelectric project on the Limay River Brief description: 163 m high concrete dam with a capacity of 2,500,000 m³. Spillway intake for 10,000 m³/sec. 1,400 MW hydroelectric plant. Preparation of detailed civil works drawings (approximately 4,600 drawings).
Location:Neuquén and Río Negro Provinces, Argentina. Year:1985-1994 Client: Hidronor S.A.