Puerto Madero Urbanization

Name: Executive project and construction management and inspection of the service infrastructure for stage C (east sector) of the Antiguo Puerto Madero urbanization.
Brief description: The project was developed for an urbanization in an area of approximately 30 ha, located east of Docks 1, 2, 3, and 4 of the old Puerto Madero. It included pavements, horizontal and vertical demarcation and light signaling, potable water, sewage and storm drains, medium and low voltage electrical energy, natural gas, telephone, cable television, data transmission, and public lighting. Total population: 115,000 inhabitants.


Location: Autonomous City of Buenos Aires, Argentina.
Year: 1997-2002
Client: Corporación Antiguo Puerto Madero S.A.

Paraná de las Palmas Water Plant

Name: Executive Project, Detail Engineering, and Technical Assistance for the Construction of the North Area Water Treatment System
Brief description: The objective of the project was to provide potable water to a population of 4,000,000 inhabitants. The works consisted of: a) 2 Water Intake Works; b) 1 Tunnel, 16 km in length and Ø 3,600 mm; c) 1 Water Treatment Plant with a capacity of 900,000 m³/day; d) 2 Large-scale Pumping Stations; and e) 6 Aqueducts.

Location: Province of Buenos Aires, Argentina.
Year: 2009-2016
Client: Odebrecht-Cartellone-Supercemento-Roggio – JV (Joint Venture)