Type of Work: Executive project, detailed engineering and technical assistance

The North Area Potabilization System consists of a work whose objective is to provide drinking water to a population of 4,000,000 inhabitants of the North Zone of Greater Buenos Aires, in the AYSA area. The works consist of: a) 2 Intake Works; b) 1 Tunnel 16 km long and 3,600 mm in diameter; c) 1 water treatment plant with a capacity of 900,000 m³ / day; d) 2 large pumping stations and e) 3 aqueducts.