Name: Executive project for the land connection with Mesopotamia. Zárate-Brazo Largo Complex. Brief description: As part of the assignment, the firm prepared the designs for the superstructure and road and rail infrastructure, including the new Zárate station and complementary foundation artwork. Prior to the design phase, the firm also undertook the direction of topographical investigations, drilling, and the discovery of materials necessary for construction, as well as geotechnical and material strength testing.