Professional Engineering Services
AYSA has entrusted Latinoconsult with the execution of the sewage network in the area called BellaVista 1 of the San Miguel district and the Las Catonas collector, which is part of the network of collectors that will collect sewage effluents from a large area of the Moreno district to take it to the Las Catonas treatment plant, located on the banks of the creek of the same name with its final destination in the Reconquista River.
The collector will receive the effluents from the areas called Santa María 1 and 2 awarded to another consulting firm.
The area called Bella Vista 1 covers about 2.33 km2 and has a population, according to the 2010 Census, of 12,881 inhabitants. The project foresees a population of 18,447 inhabitants for its horizon set in the year 2047.