This work will make it possible to increase the production of the water treatment plant by 350,000 m³/day, in order to collaborate in the supply of districts in the southwest of the Buenos Aires Metropolitan Area.
The contract includes the project review and construction supervision of:
- Pumping station composed of 3 pumps of 6.4 m3/s each
- Underground industrial warehouse on which the equipment will be installed
- Rooms with electrical, electromechanical and automation equipment
- Bypass chamber and duct link camera (Internal diameter: 4.6 m)
- Suction chamber
- Splitting chamber
- Entrance chamber to splitter chamber