Name: Work Inspection Service for the General Belgrano Plant, New Raw Water Pumping Station, 1st Stage.
Brief description: The work consisted of the construction of a pumping system from an existing conduit to an adduction chamber, a derivation chamber, a connection chamber, and a suction chamber, with the supply and assembly of 3 electric pumps of 6.4 m³/sec each, including their respective electromechanical installation for operation and the corresponding industrial building. This project will allow for the expansion of the Plant’s production by 350,000 m³/day.
Location: Province of Buenos Aires, Argentina.
Year: 2022-2024
Client: Agua y Saneamientos Argentinos S.A. (AySA)