Name: Technical and environmental inspection of the work: Sewerage system of the city of Añatuya.
Brief description: The work consists of household collector networks and main collectors. Sewage lifting station and discharge pipe. 3 electric pumps of 30 kW each, ductile iron pipe connecting to a manifold, valves, gate, and screens. Wastewater treatment plant. Stabilization ponds. Disposal of treated liquids into a receiving body.
Location: Province of Santiago del Estero, Argentina.
Year: 2022-2026
Client: Secretaría de Infraestructura y Política Hídrica del Ministerio de Obras Públicas