Name: Technical construction management, project review, development of executive projects, supervision, and contract administration for the International Nexo project.
Brief description: The works included: Road and river works: divided into several sectors, such as transportation lanes, a multi-track highway, access roads, and a bypass; a bridge over the Garupá stream, 840 meters long with vehicle and pedestrian walkways, allowing navigation underneath; railway works: 10,400 meters of railway tracks were installed; Yacyretá Reservoir, which included coastal defenses, dredging, installation of infrastructure networks (sewage, water, energy), and a complete redesign of the urban layout (streets, sidewalks, lighting, etc.); environmental management with the preparation and monitoring of an environmental impact study.

Location: Province of Misiones, Argentina.
Year: 2008-2015
Client: Entidad Binacional Yacyretá (EBY)