Type of work: Direction and Inspection of Works. 

Supervision of the adaptation of Carrera 10 (Fernando Mazuera Av.) to the Transmilenio System in section 4 between 7th street and 26th street, in Bogotá D.C. and section 5 between Calle 26 and Calle 34, in Bogotá D.C. and Adaptation of Calle 26 (Avenida Jorge Eliécer Gaitán) to the Transmilenio System in section 5 between Carrera 19 and Carrera 13, including operational connection with the Caracas Trunk, in Bogotá D.C. and in section 6 between Carrera 13 and Carrera 3 and Carrera 3 between 26th street and 19th street, in Bogotá D.C. Supervision of the construction of roads on flexible and rigid pavement, improvement and construction of public space, construction and rehabilitation of aqueduct and sewerage networks, public services networks (Natural Gas, Telecom, ETB, EPM and Codensa), signaling and Social Auditing and environmental.