Type of work: Preliminary project, bidding documents and technical specifications of the new sewage outlet. 

The design included a subfluvial outfall in the Río de la Plata of 3.8 m in diameter and 7.5 km in length, of which 3 km correspond to the diffuser. The maximum flow is 33 m³ / s. The studies included: design of the geotechnical campaign and supervision of the works. Hydraulic design and economic optimization of the duct, diffusers and ports. Analysis of construction methods. Design of the foundation and necessary structures. Beacon requirement. Design and optimization of the initial dilution in shallow waters (Cormix Software). Preparation of bidding documentation.