Name: Ezeiza International Airport – Landside
Brief description: The works included the following specialties: Structures; thermomechanical installations, drinking water, sewers, storm drains, gas, fire protection, fire detection, roads. Traffic study, geotechnics, topography, demolitions. Buildings affected: New control tower, new fire station, new main terminal, new service and escape tunnels, energy house, new level parking; refurbishment of the current Departures Terminal for domestic service; bridges over the Ricchieri Highway and over the underground railway line. Construction schedule agreed upon with Estudio Arq. MSGSSS and AA2000.
Location: Province of Buenos Aires, Argentina.
Year: 2007-2008
Client: Aeropuertos Argentina 2000 S.A.”