Type of work: Master Plan, pre-feasibility studies of works and preliminary project.
Pre-feasibility studies of works and preliminary project. The final objective is to achieve the development of the maximum economic potential of all activities related to the resource within a framework of social and sustainable development. The studies have an integral character not only in the setting of the stated objectives but also in the development of the studies, since they contemplate in order to achieve these objectives the consideration of all the physical and social aspects that affect it. It includes campaign surveys for the elaboration of the geomorphological, vegetation and soil map and the elaboration of a GIS for the Provincial Water Coordinating Unit. A Master Plan is prepared based on the prioritization of the identified works, using a hydrological mathematical model as a tool. It also includes the legal-institutional aspects related to the management and use of water resources.