Type of work: Direction and Technical Inspection of Architectural and Engineering Works.

The works consisted of remodeling the Hospital, including electrical, sanitary, gas,  thermomechanical and gaseous fluid installations, as well as civil works (structure and masonry). (3,600 m²). Covered area of works to remodel: 1,600 m². Covered area of new works: 2,000 m².