Type of work: Project review and technical-administrative inspection of the works.
The works consisted of a low-level crossing for 4 traffic lanes, with a total length of 687 m, contemplating a railway bridge with 2 lights of 13.00 m each for 2 tracks, and two roads for Dorrego and Arévalo de 16.00 m of light each.