Hospital: General de Agudos “Donación F. Santojanni”

Name: Management and technical inspection of architectural and engineering works for the “Donación Francisco Santojanni” Hospital
Brief description: The works included the construction of the administrative and consulting rooms; expansion of the physical therapy service; expansion of the on-call medical dormitories; and core 1 (new stretcher elevators). The total covered area is 7,200 m², including all installations such as electricity, medical gases, air conditioning, sanitary facilities, etc., and medical and non-medical equipment.
Location: Autonomous City of Buenos Aires, Argentina.
Year: 2000-2003
Client: Ministerio de Salud y Acción Social de la Nación. Proyecto de Desarrollo del Sector Salud en las Provincias (PRESSAL).

Irrigation El Cadillal

Name: Feasibility report for the development of the area to be served by the El Cadillal dam reservoir.
Brief description: Feasibility report for the development of a 100,000 ha area, with irrigated and rain-fed crops. The tasks performed included: agricultural, topographic, hydraulic, cadastral, edaphological, economic, and social aspects.
Location: Province of Tucumán, Argentina.
Year: 1965-1966
Client: Consejo Federal de Inversiones

Executive Project for Provision of Drinking Water Surroundings Hermoso Campo

Name: Executive project for the provision of drinking water in the Hermoso Campo area
Brief description: Executive projects were carried out and completed for the potable water systems (networks, household connections, treatment if necessary, storage, etc.) for the localities of General Capdevila (1,300 inhabitants), Itin (994 inhabitants), Hermoso Campo (8,059 inhabitants), Corzuela (19,729 inhabitants), and General Pinedo (21,835 inhabitants). The project included BIM modeling with an LOD 300 scope for the potable water networks and complementary infrastructure structures.
Location: Province of Chaco, Argentina.
Year: 2019-2020
Client: Dirección Nacional de Preinversión. Ministerio del Interior, Obras Públicas y Vivienda

Executive project for the construction of a railway yard, junction and bridge in the town of Oliveros

Name: Compilation of feasibility background, socio-environmental and economic analysis, and development of the final design for the construction of a rail yard, junction, and bridge.
Brief description: The work covered necessary institutional, legal, engineering, topographical, geotechnical, economic, and environmental aspects, among others, to launch a bidding process for the execution of the works corresponding to the future Oliveros Rail Yard.
BIM modeling with LOD300 scope for the rail yard, including the railway layout, internal roads, access routes, and vehicular bridge structures.
3D coordination and clash detection.
Location: Oliveros, Santa Fe Province. Argentina.
Year: 2017-2019
Client: Administración de Infraestructuras Ferroviarias Sociedad del Estado (ADIFSE)

Provision of drinking water, sewage and storm drains in the area of Río Primero

Name: Executive Project for the Provision of Potable Water, Sanitary Sewers, and Stormwater Drains in the Río Primero Area.
Brief description: The purpose of the study was to provide various localities in Córdoba with the executive projects for primary water, sewage, and stormwater infrastructure, according to their needs.
– BIM modeling with an LOD 200 scope for potable water, sewage, and stormwater networks.
– 3D coordination and clash detection.
Location: Province of Córdoba, Argentina.
Year: 2019-2020
Client: Dirección Nacional de Preinversión – Ministerio del Interior, Obras Públicas y Vivienda

Program for the Development of Bovine and Sheep Livestock in Morocco

Name: Program for the Development of Sheep and Cattle Farming in Morocco
Brief description: A diagnostic study of sheep and cattle production for meat and milk; its impact in different regions: breeds and characteristics; management; production costs; technical and financial assistance; commercialization. Analysis of existing slaughterhouses (for cattle, sheep, goats, and camelids). Specific recommendations for their improvement. Investment calculation. Improvement of the cold chain.
Location: Morocco
Year: 2005
Client: Ministere de l’Agriculture et de la Reforme Agraire

General Belgrano Plant – New Raw Water Lifting Station – 1st Stage

Name: Work Inspection Service for the General Belgrano Plant, New Raw Water Pumping Station, 1st Stage.
Brief description: The work consisted of the construction of a pumping system from an existing conduit to an adduction chamber, a derivation chamber, a connection chamber, and a suction chamber, with the supply and assembly of 3 electric pumps of 6.4 m³/sec each, including their respective electromechanical installation for operation and the corresponding industrial building. This project will allow for the expansion of the Plant’s production by 350,000 m³/day.
Location: Province of Buenos Aires, Argentina.
Year: 2022-2024
Client: Agua y Saneamientos Argentinos S.A. (AySA)

Port works Marina Punta del Este – Stage I

Marina Punta del Este

Name: Marina Punta del Este port works, Stage I
Brief description: A series of layout alternatives were analyzed to achieve acceptable internal movement conditions within the port area and develop the selected layout at the final project level.
Location: Punta del Este, Uruguay
Year: 2012-2014
Client: Chihuahua Club S.A.

Master plan “Proyecto San Martín”

Render proyecto

Name: San Martín Project Master Plan. Infrastructure Feasibility and Preliminary Tender Project
Brief Description: This project included the backbone networks comprising the major blocks of the San Martín urban development project, as well as the complete feasibility studies for the services for the master plan. The project included the following specific areas: drinking water, sewage, stormwater, electrical grid, lighting and weak currents, gas, road geometric design, and pavements.
Location: Province of Buenos Aires, Argentina
Year: 2021-2025
Client: Quality Invest S.A.

Irrigation Mari Menuco

Name: Mari Menuco Executive Project, for the supply of drinking water and irrigation
Brief description: Development of a dual-purpose system consisting of the intake and conveyance of water from Lake Mari Menuco to the confluence area, with the objective of providing drinking water to the cities of Senillosa, Plottier, Neuquén, Centenario, Vista Alegre, and San Patricio del Chañar, with a project population of 470,000 inhabitants, and simultaneously delivering water for irrigation to 15,000 hectares of land in the plateau area through which the pipeline will cross.
Location: Neuquén Province, Argentina.
Year: 2004-2006
Client: Ente Provincial de Agua y Saneamiento (EPAS)