Name: Chocón – Cerros Colorados Hydroelectric Plants
Brief Description: The comprehensive project for the Chocón-Cerros Colorados complex ranged from technical and economic feasibility studies to the development of the final project and the bidding documents. The construction of these works responded to various strategic needs, the most important of which were: flow regulation and flood control, water utilization, hydroelectric power generation, and social and recreational development.
The documented work comprised several key stages:
-Feasibility Studies: Basic hydrological, geological, and topographic analyses were conducted.
-Final Project: Technical reports, detailed plans, technical specifications for construction, administrative specifications, and the works budget were prepared.

Location: Neuquén and Río Negro Provinces, Argentina.
Year: 1961–1963
Client: Agua y Energía Eléctrica S.E.