Name: Technical and Environmental Inspection Services for the “Construction of the Wastewater Treatment Plant for the City of Formosa” Project
Brief description: Its treated effluent will be pumped to the Riacho Oro, approximately 2,600 m away, with the pipeline route running along the flood defense barrier itself. The project’s design flow rates are 0.554 m³/sec for a 10-year horizon and 0.93 m³/sec for a 20-year horizon. The hydro-electromechanical works involve 6,235 m³ of concrete. The project has benefited a population of 184,000 inhabitants.
Location: Province of Formosa, Argentina.
Year: 2014-2019
Client: Ministerio de Planificación, Inversión, Obras y Servcios Públicos. Unidad Central de Administración de Programas (U.C.A.P.)