Type of Work: Technical and environmental inspection. 

The Work consisted of the construction of a Sewage Treatment Plant on the southern defense of the City of Formosa, for a population of 184,000 inhabitants, whose treated effluent will be propelled to the Riacho Oro, some 2,600 m distant, with a pipeline over the defense itself. Project flows at 10 years are 0.554 m³ / sec and at 20 years, 0.93 m³ / sec. The hydroelectromechanical work has 6,235 m³ of concrete. The Consultant developed all the necessary technical and administrative activities to ensure that the Contractor will execute the works effectively complying with the stipulations contained in their respective Contract, in the designs and in the Specifications. The work included the review of the Contractor’s socio-environmental Management Plan and the monitoring of its implementation.