Execution of a pumping basin, the construction of a chamber and bypass conduit, a connection chamber and a suction chamber with provision and assembly of 3 electric pumps of 6 m³/sec, with all the necessary electromechanical installation for its operation and the respective industrial warehouse.

In addition, an underground conduit to a future partitioning chamber.