Type of work: Executive Project.

Development of a dual-purpose system that consisted of taking and conducting water from Lake Mari Menuco to the confluence area, with the aim of providing drinking water to the cities of Senillosa, Plottier, Neuquén, Centenario, Vista Alegre and San Patricio del Chañar, with a project population of 470,000 inhabitants, and simultaneously deliver water for irrigation of 15,000 ha of land in the plateau area through which the pipeline work will pass.

STAGE I: It included the necessary works in order to determine the general characteristics of the work and the definition of the trace.

STAGE II: Completion of the preliminary draft of the entire pipeline work, both in its linear part and in its head, works of art, derivatives, reservoirs, purification and distribution. It also included the preliminary draft of an irrigation system for the plateau in the area of ​​influence of the work, determining derivation and control works, primary and secondary channels, drains, subdivision, feasible crops, etc. The work included the aerial photogrammetric restitution and the edaphological studies of the irrigation area.

STAGE III: Evaluation of the Executive Project of the intake work.