Type of work: Work inspection / Structural calculations review / Documentation review of new electrical installations / Hygiene and safety / Environment.
a) Work linking the Boards: construction of the Linkage of the Boards of the 25 de Mayo Highway in order to generate an exclusive corridor for the circulation of passenger vehicles on the layout of said highway from PK 0 +630 to PK 8 + 000 (7,370 m). It included the replacement of new luminaires installed on the right lane of each direction of traffic, In the Section between the progressive PK 0+ 630 to PK 8 + 000; b) Viaduct Expansion Work: Expansion of the width of the current roads of the AU 25 de Mayo in the Center direction to be able to materialize the exclusive Metrobus lane from the Dellepiane toll embankment to Pillado street, intervening approximately 1,000 m of the Highway. The work included the review of the Contractor’s socio-environmental Management Plan and the monitoring of its implementation. From the Dellepiane toll embankment to Calle Pillado, intervening approximately 1,000 m from the Highway.