Type of work: Site inspection. 

The work consists of duplicating the road of National Route No. 14, as an integral part of the corridor in the Province of Entre Ríos. The basic work and pavement to be executed for the duplication of the road will be done at a crown width of 11.30 m. Composed of a 7.30 m wide rigid paved road, an external shoulder of 3.00 m paved in 2.5 m and 0.50 m covered with grass and an internal shoulder of 1.00 m covered with grass soil. The total length of this section of work is 34,781.98 meters. The contract sector includes 4 bridges, namely: Bridge over Arroyo La China; Bridge over Arroyo El Sauce; Bridge over Arroyo El Molino; and Bridge over Arroyo Colman. The Inspection will carry out the necessary tasks to ensure that the Work Contractor effectively complies with the stipulations contained in the Contract, in the Designs and in the Specifications. The technical-administrative control of the works will be carried out and it will require that they be carried out within the required quality standards and in accordance with the best engineering practices; and minimizing the environmental impact that they may have.