Name: Review of the executive project and inspection of the complete renovation of the track infrastructure of the General Belgrano Railway (Branch F1, Section: Monje to Timbúes).
Brief description: The main tasks included supervising the cleaning and preparation of the area, removing and grading the existing track, and preparing the site for the new installation. The new narrow gauge track structure was then assembled, using long welded rails, concrete sleepers, and elastic fasteners. The project included the renovation of track switches and level crossings, the reconditioning of used rails, and monitoring of the contractor’s socio-environmental management plan.
Location: Province of Santa Fe, Argentina.
Year: 2011-2019
Client: Administración de Infraestructuras Ferroviarias S.E. (ADIFSE)