Name: Inspection of the works: Diversion dam on the Salado River, connecting canal with the Canal de Dios, Cruz Bajada, Copo District.
Brief description: The constructed works include an intake that allowed a flow of 18 m³/s to be diverted from the river, feeding the Connecting Canal (0.5 km long) to the flow distribution node and, from there, to the previously constructed section of the Canal de Dios (22.8 km long).
Location: Santiago del Estero Province, Argentina.
Year: 2017-2022
Client: Ministerio de Obras Servicios Públicos y Medio Ambiente, Subsecretaría del Agua de la Pcia. de Santiago del Estero.