Type of Work: Technical inspection.
The works built, located about 3 km downstream from the border with the Province of Salta, in the area called Cruz Bajada, included the execution of a weir over the Salado River, a sand trap, a fish ladder, an intake that allowed the diversion of from the river a flow of 18 m³ / s feeding the Link Channel (0.5 km long) to the distributor node of flows and, from the latter, to the section that was built of the Canal de Dios (22.8 km long ).