Name: Supervision of maintenance and complementary works at the “José M. Ramos Mejía” General Hospital, the “Teodoro Alvarez” General Acute Care Hospital, and the “José Dueñas” Dental Hospital. Brief description: The works included engineering review; planning and management control; construction supervision, contract administration, and report preparation.
Location: Autonomous City of Buenos Aires, Argentina. Year: 1992-1994 Client: Municipalidad de la Ciudad de Buenos Aires
Name: Basic engineering and technical assistance for the 132 kV El Pluma-Perito Moreno and Perito Moreno-Los Antiguos interconnection, in a double 330 kV line, and complementary works. Brief description: Review of the basic engineering for: 132 kV El Pluma-Perito Moreno high-voltage line; 132 kV Perito Moreno-Los Antiguos high-voltage line; El Pluma substation; Perito Moreno transformer station; Los Antiguos transformer station. Execution of basic engineering for: 2×33 kV Perito Moreno-Los Antiguos medium-voltage lines and Los Antiguos transformer station for 33/132 kV. Complete works estimate. Location: Province of Santa Cruz, Argentina. Year: 2019 Client: Fondo Fiduciario para el Transporte Eléctrico Federal
Name: W Hotel, Florida, USA Brief description: The hotel is located a few kilometers from Miami’s commercial center, on Biscayne Bay. BIM modeling and LOD 200 computation of building facade elements.
Location: Miami, United States of America Year: 2021 Client: Fourzero
Name: Project Review and Inspection of Works for the Extension of Line “D” of the Buenos Aires Subway. Brief Description: Included: tunnel, stations, electrical, sanitary, and service installations; laying of overhead lines along the entire length. Renewal of partial track sections and extension of tracks from Carranza Station to Congreso de Tucumán. Renewal of the signaling systems between Catedral and Ministro Carranza Stations and extension of the systems from Carranza to Congreso de Tucumán. Renewal of the Santa Fe Subway. Expansion of the Carlos Pellegrini and Plaza Italia Subways. Equipment for the Colegiales Subway and related works. Provision and installation of escalators.
Location: Autonomous City of Buenos Aires, Argentina. Year: 1991-2000 Client: Subterráneos de Buenos Aires S.E. (SBASE)
Name: Technical supervision of the adaptation works on Calle 26 (Av. Jorge Eliécer Gaitán) and Carrera 10ª (Av. Fernando Mazuera) to the Transmilenio System. Brief description: Supervision of the construction of flexible and rigid pavement roads, improvement and construction of public spaces, construction and rehabilitation of water and sewer networks, public service networks (natural gas, Telecom, ETB, EPM, and Codensa), signage, and social and environmental supervision. The work included the review of the Contractor’s Socio-Environmental Management Plan and monitoring of its implementation.
Location: Bogotá, Colombia. Year: 2008-2013 Client: Instituto de Desarrollo Urbano (IDU)
Name: Comprehensive inspection and control of the urban sanitation public service in Zone 3 of the City of Buenos Aires. Brief description: The inspection included waste collection, sweeping, and other related tasks performed by the company contracted for this purpose. Computer systems consisting of a GIS application with a GPS positioning system and data transmission via GPRS technology were used. Deviations were transmitted online to the operations base. The system used generates daily and monthly reports and calculates all the performance indices for each urban sanitation service provided by the Contractor.
Location: Autonomous City of Buenos Aires, Argentina. Year: 2005-2009 Client: Dirección General de Limpieza (ex-Dirección General de Higiene Urbana) del GCBA
Name: Preliminary and final designs for drinking water supply and electricity supply systems in the towns of Lodja, Lomela, Kole, Katako-Kombe, Basoko, Opala, Ubundu, Djolu, Ikela, Bokungu, Lubutu, and Punia. Brief description: General surveys; population surveys. Hydrological studies; topographical surveys; chemical and bacteriological analysis using proprietary equipment. Preliminary designs for drinking water supply systems: groundwater pumping in 11 towns; treatment plants; drinking water storage and distribution facilities. Preliminary designs for electricity production and distribution systems and public lighting. Final designs and tender documents for the works.
Location: Democratic Republic of the Congo (formerly Zaire) Year: 1976-1977 Client: Régie de Distribution d’Eau (REGIDESO)”
Name: Detailed engineering of the new departure terminal and underground parking lot at Ezeiza International Airport. Brief description: a) Departures Hall: total area of 25,000 m². b) Parking lot on three levels (two of them underground). Total area of 14,000 m². c) Remodeling of a 3,000 m² area of the boarding waiting hall at the current International Pier. Access roads, storm drains, vertical signage, and lighting for the new complex. 11,000 m² of paved area.
Location: Province of Buenos Aires, Argentina. Year: 2000 Client: Petersen, Thiele & Cruz S.A.C. y M.”
Name: Detailed Inspection and Engineering Department for the Limay River Hydroelectric Project in Alicurá Brief description: 115 m high earth dam with a capacity of 12,000,000 m³. Intake and spillway for 3,000 m³/sec. 1,000,000 kW hydroelectric plant. Discharge channel. Temporary village. River diversion works through two 2,000 m long, 9.00 m diameter tunnels. a) Review and adjustment of the Executive Project; b) Technical assistance; c) Preparation of detailed civil works plans, installation of machinery and electromechanical equipment; e) Technical and administrative management; f) Inspection; g) Technical assistance during plant commissioning and the warranty period.
Location: Neuquén and Río Negro Provinces, Argentina. Year: 1975-1995 Client: Hidronor S.A.
Name: Inspection of the works: Diversion dam on the Salado River, connecting canal with the Canal de Dios, Cruz Bajada, Copo District. Brief description: The constructed works include an intake that allowed a flow of 18 m³/s to be diverted from the river, feeding the Connecting Canal (0.5 km long) to the flow distribution node and, from there, to the previously constructed section of the Canal de Dios (22.8 km long).
Location: Santiago del Estero Province, Argentina. Year: 2017-2022 Client: Ministerio de Obras Servicios Públicos y Medio Ambiente, Subsecretaría del Agua de la Pcia. de Santiago del Estero.