Previous
Next
  • Client

    Total Austral S.A.

  • Country

    Argentina

  • Location

    Pcia. de Neuquén

  • Area

    Manufacturing - Energy

  • Year

    1995

Type of work: Direction and inspection of the topographic and geotechnical works of the Aguada Pichana gas pipeline and processing plant project. Hydrological studies

Central Processing Plant (CPF), four (4) cluster sites, three (3) trunk lines of approximately eight (8) to ten (10) km in length, which transport natural gas, forty (40) km of gas pipeline that they transport the processed gas and forty (40) km of radio communication lines. 150 km northwest of the city of Neuquén, near the town of Añelo. Preparation of the specifications of the topographic studies and geotechnical investigations, call for bids for the award of the works and direction and inspection thereof. Work progress control, work test control, measurement and certification. Reception of the works. Execution of hydrological studies in seven alluvial basins and in the Bajo de Añelo, analysis of floods in the Neuquén River, downstream of Portezuelo Grande, and recommendations regarding the erosion of the riverbed.