  • Client

    Pan American Energy

  • Country

    Argentina

  • Location

    Pcia. de Chubut

  • Area

    Energy

  • Year

    2013-2016

Type of work: Inspection of work, control and certification of progress, inspection of civil works, electromechanics, assembly and commissioning 

The work consists of an expansion of the electric power generation capacity of the current generation plant located within the Cerro Dragón field, made up of 2 gas turbogenerators of 40 MW each. The expansion consists of 2 stages: • Stage 1: Installation of 2 turbogenerators with gas fuel, mobile aero-derivative turbines of 20 MW each. This stage lasts for 6 months. • Stage 2: It is the central stage consisting of closing the combined cycle by adding heat recovery boilers to generate steam in an 80 MW turbine, taking the installed power of the current plant from 80 to 160 MW. The work is carried out according to the “turnkey” modality, which includes engineering, supplies, civil and electromechanical works, assembly, commissioning and start-up. The duration of this stage is 21 months once Stage 1 is completed. The work is carried out on a construction site of approx. 800 x 375 m, with a maximum installation height of 60 m.