Previous
Next
  • Client

    Gobierno de la Ciudad de Buenos Aires

  • Country

    Argentina

  • Location

    City of Buenos Aires

  • Area

    Hydraulics

  • Year

    2001-2005

Type of job:

a) Master Plan for Hydraulic Management of the City of Buenos Aires: preliminary draft level.
b) Arroyo Maldonado Basin: Executive Project and Bidding Documentation. 

Definition of structural and non-structural measures aimed at optimizing flood management throughout the City. Evaluation of alternatives and formulation of an executive project to comprehensively resolve the problem, primarily addressing hydraulic, urban, environmental and land use criteria, ensuring the reliability of its operation and maintenance. Preparation of the bidding documentation for the works and the international credit application for the financing of the works.

The Master Plan included the following works:

  • Arroyo Maldonado basin executive project (TBM)
  • Arroyo Vega basin executive preliminary draft (TBM)
  • Arroyo Medrano basin executive preliminary draft
  • Antiguo – Ugarteche basins Executive preliminary Draft
  • Boca – Barracas basin executive preliminary draft
  • Ochoa y Elía basin executive preliminary draft
  • Arroyo Erézcano basin Executive preliminary draft
  • Arroyo Cildañez basin Executive preliminary draft
  • Larrazábal and Escalada basin executive preliminary draft