Previous
Next
  • Client

    Subsecretaría de Transporte-Gobierno de la Ciudad de Buenos Aires

  • Country

    Argentina

  • Location

    City of Buenos Aires

  • Area

    Transportation

  • Year

    2015 - 2016

Type of Work: Preliminary Project and Technical Study of Environmental Impact 

The work includes the Draft Project and the Environmental Impact Study for the construction of the Miter Railroad Viaduct, which proposes to integrate the volume of the viaduct into the urban space. The elimination of the level crossings will allow an increase in the speed and frequency of the formations. It will start from the current elevation of the road at the intersection of Av. Dorrego to the Belgrano C station, from which the descent of the track will begin to connect with the current roads in the area near Congress Street. The current Lisandro de la Torre and Belgrano C stations must be developed at a high level, including the corresponding building modifications.