Previous
Next
  • Client

    ADIF S.E. - Administración de Infraestructuras Ferroviarias Sociedad del Estado

  • Country

    Argentina

  • Location

    Pcia. de Santa Fe

  • Area

    Transportation - BIM

  • Year

    2017-2019

Type of Work: Socio-environmental and economic study, Measurements, Executive Project and Bid Documentation

  • BIM modeling with scope LOD300 railway maneuvering area that includes the railway layout, internal roads, access routes and vehicular bridge structures.
  • 3D coordination and interference analysis.

The works covered aspects related to institutional/legal, engineering, topographical, geotechnical, economic, environmental, cadastral surveying and documentation studies that have allowed the call for tenders to execute the works corresponding to the future Oliveros railway yard, a new railway branch towards Timbúes port, railway bridge over the Carcarañá river and the new vehicular bridge over National Road 11.

  • Length of railway infrastructure designed: 26,000 m.
  • Length of bridge designed over the Carcarañá River: 100 m.
  • Vehicle bridge length NR 11: 65 m plus access ramps of 1000 m in total length.