Master plan “Proyecto San Martín”

Render proyecto

Name: San Martín Project Master Plan. Infrastructure Feasibility and Preliminary Tender Project
Brief Description: This project included the backbone networks comprising the major blocks of the San Martín urban development project, as well as the complete feasibility studies for the services for the master plan. The project included the following specific areas: drinking water, sewage, stormwater, electrical grid, lighting and weak currents, gas, road geometric design, and pavements.
Location: Province of Buenos Aires, Argentina
Year: 2021-2025
Client: Quality Invest S.A.

Irrigation Mari Menuco

Name: Mari Menuco Executive Project, for the supply of drinking water and irrigation
Brief description: Development of a dual-purpose system consisting of the intake and conveyance of water from Lake Mari Menuco to the confluence area, with the objective of providing drinking water to the cities of Senillosa, Plottier, Neuquén, Centenario, Vista Alegre, and San Patricio del Chañar, with a project population of 470,000 inhabitants, and simultaneously delivering water for irrigation to 15,000 hectares of land in the plateau area through which the pipeline will cross.
Location: Neuquén Province, Argentina.
Year: 2004-2006
Client: Ente Provincial de Agua y Saneamiento (EPAS)

National Route No. 14

Name: Inspection of the work: National Route No. 14, section 2, junction with Provincial Route “J” (Colonia Elía), junction with Provincial Route No. 29, Section 1: Junction with Provincial Route “J” (Colonia Elía) – Arroyo Colman.
Brief description: The work consisted of duplicating the roadway of National Route No. 14. The total length of this work section is 34,781.98 m. The contract sector includes 4 bridges. Technical-administrative control of the works was carried out to ensure they are performed within the required quality standards.
Location: Province of Entre Ríos, Argentina.
Year: 2007-2013
Client: Dirección Nacional de Vialidad.

Hospital: Petrona V. de Cordero

Name: Supervision and inspection of architectural and engineering works for the “Petrona V. de Cordero” Hospital.
Brief description: The works consisted of the remodeling of the hospital, including electrical, plumbing, gas, thermomechanical, and gaseous fluid installations, as well as civil works (structure and masonry). Covered area of ​​​​works to be remodeled: 1,600 m². Covered area of ​​​​new works: 2,000 m².
Location: Province of Buenos Aires, Argentina.
Year: 2000-2001
Client: Ministerio de Salud y Acción Social de la Nación. Proyecto de Desarrollo del Sector Salud en las Provincias (PRESSAL).

Comahue – Cuyo Interconnection Northern Section

Name: Technical Assistance and Inspection of Works for the Comahue-Cuyo Interconnection, Northern Section
Brief Description: The works included: a) a 188 km long 500 kV extra-high voltage line and a 7 km long 200 kV high voltage line between the new line; and b) the transformer stations in Greater Mendoza (expansion) and the new transformer station in Los Reyunos, both at 500 kV, and the expansion of the latter to 220 kV. The work included the review of the contractor’s socio-environmental management plan and monitoring of its implementation.
Location: Mendoza Province, Argentina
Year: 2009-2011
Client: Coordinating Unit for Project Execution (UCEP – CAF) for the Comahue-Cuyo Interconnection

Interconnection 500 kV ET Rodeo-ET La Rioja Sur – Section V

Name: Basic studies, execution of basic engineering, preparation of bidding documentation, and environmental impact study for the 500 kV Rodeo transformer station-La Rioja Sur transformer station interconnection works (Section V)
Brief description: The tasks performed were for the construction of:
The extra high voltage (500 kV) single-strand transmission line between the Rodeo transformer station (San Juan) and the La Rioja Sur transformer station (La Rioja), approximately 350 km long.
The expansion of the La Rioja Sur transformer station to allow the triple-strand output to the Rodeo transformer station.
The 500 kV yard at the Rodeo transformer station, in accordance with the existing preliminary design.
Included the preparation of the general and technical specifications, and the environmental impact study for the entire transmission line and the corresponding transformer stations.
Location: San Juan and La Rioja Provinces, Argentina.
Year: 2017-2019
Client: Comité de Administración del Fondo Fiduciario para el Transporte Eléctrico Federal (CAF)

Formosa rain studies

Name: Flood Threat Assessment and Adaptation of Structural Mitigation Measures.
Brief Description: Analysis of the behavior of the current stormwater drainage system in the city of Formosa and its pumping stations. Identification and selection of alternatives for system remodeling and pumping station optimization. Preparation of terms of reference for the development of final projects.
Location: Province of Formosa, Argentina.
Year: 2014
Client: UEP-UCPyPFE. Ministerio de Planificación Federal, Inversión Pública y Servicios de la Nación.

National Route No. 23

Name: Supervision of the work on National Route No. 23, Section: Ing. Jacobacci-Comallo. Section I: km 0.00-km 45.00.
Brief description: Inspection of a 45 km long road work with two bridges. The work consisted of the new construction of National Route No. 23, as an integral part of the east-west corridor. All technical and administrative activities necessary to ensure compliance with the contract, designs, specification documents, and projects were carried out.
Location: Province of Río Negro, Argentina.
Year: 2014-2017
Client: Dirección Nacional de Vialidad.

Engineering studies for mitigation works in the Punta del Este Marina

Marina Punta del Este

Updating the hydrological and hydraulic studies of the El Potrero Stream in Portezuelo Bay from the Control Works at Laguna del Sauce to its mouth at the site of the future port works for the Punta del Este Marina. The studies determined a baseline for the El Potrero Stream without any works and the influence of the proposed marina works on its operation. The studies analyzed alternative works to mitigate the effects of flooding on neighboring properties. The selected alternative was developed at the Final Project level, contemplating the construction of 1,700 m of riparian defense with mattresses.

Study for the integral use of the river Negro

Name: Study for the Comprehensive Utilization of the Negro River. Stages I and II
Brief description:
Stage I: Inventory-level study to establish possible alternative uses for the Negro River (1,000 m³/s), from the confluence of the Limay and Neuquén rivers to its mouth in the Atlantic Ocean (650 km long). The following work was carried out: a) Collection and analysis of information; b) Population determination; c) Study of resources; d) Calculation of design flows for drinking water and wastewater disposal; e) Environmental studies; f) Soil studies; g) Agroeconomic studies.
Stage II: Pre-feasibility studies for an area of ​​approximately 100,000 ha. Water supply to populations and industries. Irrigation, drainage, and land reclamation development. Fruit and vegetable production. Land linkages and transportation. Fruit and vegetable production. Hydroelectric production. River navigation and transport. Flood control, erosion, riverbank and alluvium protection. Ecological and natural resource preservation. Tourism and recreation.
Location: Río Negro Province, Argentina.
Years: 1986-1987 and 1989-1991
Client: Agua y Energía Eléctrica S.E.