Puerto Madero Urban Development

Previous
Next
  • Client

    Corporación Antiguo Puerto Madero S.A.

  • Country

    Argentina

  • Location

    Ciudad de Buenos Aires

  • Area

    Urban Development

  • Year

    1998-2001

Type of work: Executive project and direction and inspection of the works. 

Basic project, executive project and construction management of the infrastructure and services, of an urbanization in an area of approximately 125 ha, located east of Dikes 4 of the old Puerto Madero of the City of Buenos Aires. Sewer drains, Pavements of avenues and streets with 13 km in length, Horizontal and vertical demarcation and light signaling, Drinking water, Storm drains, Electric power in medium and low voltage (85 mW), Natural gas. Telephony, Cable TV, Data Transmission, Public Lighting.

Paraná de las Palmas Water Plant

Previous
Next
  • Client

    Odebrecht - Cartellone -Supercemento -Roggio (UTE)

  • Country

    Argentina

  • Location

    Pcia. de Buenos Aires

  • Area

    Water Treatment

  • Year

    2009-2013

Type of Work: Executive project, detailed engineering and technical assistance

The North Area Potabilization System consists of a work whose objective is to provide drinking water to a population of 4,000,000 inhabitants of the North Zone of Greater Buenos Aires, in the AYSA area. The works consist of: a) 2 Intake Works; b) 1 Tunnel 16 km long and 3,600 mm in diameter; c) 1 water treatment plant with a capacity of 900,000 m³ / day; d) 2 large pumping stations and e) 3 aqueducts. 

Aña Cua Hydroelectric Power Plant Inspection

  • Client

    EBY - Entidad Binacional Yacyretá

  • Country

    Paraguay

  • Location

    Depto. de Itapúa

  • Area

    Hydraulics - Power Supply

  • Year

    2020 - 2026

Type of Work: Inspection of Civil Works, Assembly and Commissioning of Hydromechanical and Electromechanical Equipment. 

The service consists of the execution of all tasks related to the Inspection of Civil Works, Assembly and Commissioning of Hydromechanical and Electromechanical Equipment, certification of progress, quality management, industrial safety and other aspects of the Expansion works of the Yacyretá Hydroelectric Power Plant in the Aña Cua branch.

Urban infrastructure and coastal treatment of the City of Posadas

  • Client

    Entidad Binacional Yacyretá

  • Country

    Argentina

  • Location

    Pcia. de Misiones

  • Area

    Urban Development - Hydraulic

  • Year

    2008-2015

Type of Work: Project review, development of executive projects and technical direction of works  

The left bank works include road works and related coastal treatment river works, distinguishing the following sectors: • Coastal treatment-southern transport strip; • Multitrocha Garita-Arroyo Garupá; • Southern access and Garita road node • Arco-Garita bypass km 10; • Coastal treatment-northern transport strip; • Bridge over Garupá stream on National Route No. 12 and relocation of National Route No. 12 at the accesses to the bridge. The characteristics of the Garupá stream bridge are as follows: a total length of 840 m and it is made up of 30 spans of 28 m each. It has two 7.30 m wide carriageways, with central New Jersey and two 1.20 m wide pedestrian lanes, located on both sides of the bridge, with a 12 m clearance to allow for sport navigation. Uniting the Garupá station and the International Bridge, the laying of railway lines with a total length of 10,400 m and the works of the station itself were executed. For the raising of the Yacyretá reservoir (up to level +84.50), the following works are planned: preliminary works, clearing, cleaning and demolition; coastal defense and landfills up to level 84.50, infrastructure networks (sewers, water, rainwater and energy); recomposition of the urban fabric, which includes pavements, curbs, gutters, sidewalks, public lighting, landscaping, embankments, paved roads, highway bridges, sports fields, pedestrian bridge, road signs, road lighting. The work included preparation of an environmental impact study, review of the Contractor’s socio-environmental management plan and monitoring of its implementation.

Expansion of Av. Gral. Paz

Previous
Next
  • Client

    Dirección Nacional de Vialidad

  • Country

    Argentina

  • Location

    Pcia. de Buenos Aires

  • Area

    Transportation

  • Year

    1971-1972

Type of Work: Executive project and complete documentation.  

Executive project and complete documentation for the remodeling of the General Paz Avenue, taking it to the category of urban highway, with total access control, in the section: “Llavallol-Santo Tomé”, length: 5.2 km. • Campaign work: topographic surveys, soundings, tests; • Executive layout project, basic works of intercoms, bridges and pavements including the designs of the slope, drains, signaling, design of the protection and security elements; • Computations and budgets. Complementary specifications.

Drinking water for the cities of La Ceiba, El Progreso and Puerto Cortés

Previous
Next
  • Client

    SANAA - Servicio Autónomo Nacional de Acueductos y Alcantarillados

  • Country

    Honduras

  • Location

    Dptos. de Yoro, Cortés y Atlantida

  • Area

    Water Management

  • Year

    1976-1977 / 1980-1984

Type of Work: Executive project, Direction and technical inspection of the work. 

Project calculation population: 160,000 inhabitants. Population and consumption studies. Choice of surface and underground water supply sources, chemical and bacteriological analyzes. Topography work. Preliminary draft of the intake and conduction works, the water purification treatment systems and the distribution network and storage reserves. Executive projects, including specifications, calculations, budgets and technical documentation for the call for bids for the works.

Inspections of drinking water works that include the purification of water from surface sources for the cities of La Ceiba, Puerto Cortés and El Progreso for a future population served by the works of 240,000 inhabitants.
The works to be inspected included in La Ceiba and Puerto Cortés: works for taking surface water from the river, lifting station, water treatment plant, conduction lines, storage tanks and distribution networks. The purification facilities totaled a capacity of 0.540 m³ / s.
In Progreso, the works included: well field, conduction lines, storage tank and distribution network.
For the three works, the following tasks were carried out in parallel: Project review, Work progress control, Scheduling, execution and control of field tests, Quality control and inspection of materials and equipment, in the factory and in works. Laboratory tests. Monthly measurement of the executed works and review of the works certificates, Reception and control of dispatch of equipment and materials, Provisional and definitive reception of the works. The hydroelectromechanical work has 3,500 m³ of concrete.

Irrigation of the Northwest Cañar development project

Previous
Next
  • Client

    FIDA - Fondo Internacional de Desarrollo Agrícola

  • Country

    Ecuador

  • Location

    Pcia. de Cañar

  • Area

    Agriculture

  • Year

    1990-1991

Type of Work: Executive Project. 

Preparation of the executive project of a regulation dam, several intake works, main and secondary channels for the irrigation of approximately 4,400 ha in areas of the Parishes of Tambo, Juncal, Zhud, Suscal, San Francisco Gualleturo and San Antonio de Pahuancay, in the Province of Cañar.

Highway CA-5 North – Comayagua Valley

  • Client

    Programa de Desarrollo de las Naciones Unidas (PNUD)-Secretaría de Obras Públicas, Transporte y Vivienda (SOPTRAVI)-Dirección General de Carreteras (DGC)

  • Country

    Honduras

  • Location

    Comayagua Valley

  • Area

    Transportation

  • Year

    2003-2004

Type of Work: Feasibility Study and Final Design for Construction. 

Determination of the technical and economic feasibility and environmental studies of the execution of the Start-End improvement works project of the Comayagua Valley, with an approximate length of 29.6 km. The purpose of the study was to improve the capacity of the highway, through road duplication, crossings at different levels and other road improvements. The tasks carried out were the following: Road inventory; Volumetric censuses. Speed studies; Origin and destination surveys; Socioeconomic characteristics of the study area; Determination of rates for traffic projections; Study of alternatives; Economic evaluation of the global plan; Environmental Impact Assessment (EIA); Topographic surveys; Economic-financial feasibility and Cargo Censuses.

San Victorino Transmilenio Station

  • Client

    IDU - Instituto de Desarrollo Urbano

  • Country

    Colombia

  • Location

    Ciudad de Bogotá

  • Area

    Transporte

  • Year

    2003-2004

Type of Work: Supervision and control of technical, administrative, financial and environmental management. 

Technical, administrative, financial and environmental supervision of the design adjustments and construction of the San Victorino Intermediate Station, located on Avenida Jiménez by the Caracas trunk for the Transmilenio system in Bogotá D.C. The work included the review of the Contractor’s socio-environmental Management Plan and the monitoring of its implementation.

Ezeiza International Airport – Airside

  • Client

    Aeropuertos Argentina 2000 S.A.

  • Country

    Argentina

  • Location

    Pcia. de Buenos Aires

  • Area

    Transportation

  • Year

    2007

Type of Work: Preparation of technical documentation.  

The works included the preparation of the technical documentation defined as Preliminary Draft and Expansion Project of the commercial and cargo platform and construction of a new foxtrot taxiway, with the following specialties: • Topography; • Floors and Pavements; • Visual aids; • Aircraft positions on the apron; • Beaconing; • Geometric design; • Storm drains; • Study of work stages; • Technical specifications; • Computation and budget; • Retrofitting of the fuel supply system.