-
Client
Aeropuertos Argentina 2000 S.A.
-
Country
Argentina
-
Location
Pcia. de Buenos Aires
-
Area
Transportation
-
Year
2007-2008
Type of Work: Preparation of technical documentation – Executive Project. Suitable for bidding and contracting of work.
The works included the following specialties: • Structures; • Thermomechanical installation (air conditioning, heating and ventilation); • Installation of drinking water and sewers; • Storm drains; • Installation of gas; • Installation against fire; • Fire detection installation; • Roads; • Traffic study; • Geotechnics; • Topography; • Demolitions; • Coordination of facilities; • Schedule of work agreed with Estudio Arq. MSGSSS and AA2000. These specialties apply to the following buildings: • New Provisional Terminal (Canceled); • New control tower; • APRON / New Fire Terminal; • New Main Terminal (approximately 150,000 m²); • New service and escape tunnels; • Energy house; • New level parking; • Re-functionalization of the current Departures Terminal as Domestic; • Bridges over the Ricchieri motorway and over the underground railway line.