Railway Belgrano: Lucila – Petronilla

Type of Work: Inspection and supervision of work and engineering. 

The main tasks carried out in the Supervision were: cleaning the section and the conditioning of channels and sewer beds; auscultation of the existing rails, the removal of the existing track, its dismantling, classification, transportation and storage; conformation of the new subgrade and cross-sectional profile of the track zone, according to the typical profile specification, design standards and the executive project approved by the Inspection; assembly and installation of the new narrow gauge track structure (consisting of long rails welded by electric butt welding, elastic fixings and concrete sleepers); provision and watering of stone ballast and its compaction and the consequent transversal and longitudinal leveling of the new track by means of manual lifting, mechanized and mechanized finishing to obtain the definitive positioning; renovation, rehabilitation and overhaul of Track Devices; renewal of Level Crossings (PAN); Reconditioning of rails used for use. The work included the review of the Contractor’s socio-environmental Management Plan and the monitoring of its implementation.

Subway Line “E”: Moreno – Plaza de los Virreyes

Type of work: Engineering review and inspection of works. 

Execution of the civil works necessary for the completion of the Emilio Mitre, Medalla Milagrosa, Varela and Plaza de los Virreyes stations. Laying of tracks for the complete extension from the José María Moreno station to the end of the route at Plaza de los Virreyes (3,600 m long). Laying the contact line along the entire length of the extension.

Salta City Water Treatment Plant – Southern Area

The work consists of an expansion of the existing plant that will increase its processing capacity from 2,600 m³/h to 5,000 m³/h.

A new module will be built that includes screens, sand removal, a lifting station, primary settlers, trickling beds with a stone mantle, secondary settlers, chlorine gas dosing, contact chamber, and drainage to the Arenales River.

New headquarters of the General Archive of the Nation

Type of Work: Technical Supervision and Inspection of the construction of the work. 

Construction Supervision Service for the Construction of the New Headquarters of the General Archive of the Nation, whose property is included between Pichincha streets, November 15th of 1889, Pasco and Rondeau extension.

Ocean Palms Building, Florida, US

Type of Work: BIM development, with the computation of elements.

Ocean Palms is a 42-story multifamily complex located in the city of Miami, Florida. It must be restored in its facade and glazing.

Sewerage Plan of the Northwest of Buenos Aires

Type of work: The first Stage of Preliminary Studies, the Projects of Collecting Networks, Pumping Stations and pipelines of the Master Plan and of the Works of the First Stage. Bidding documentation of the latter. 

The works to be carried out consist of the preparation of a Sewage Master Plan (Collection Networks, Pumping Stations, Conduction and Treatment Plant) and Executive Design of the 1st stage works. Their implementation comprises 5 stages which are: 1) Preliminary Studies (compilation of information, studies, design parameters and identification of alternatives); 2) Selection of alternatives (health pre-designs, environmental, economic and management studies, payment capacity survey); 3) Master Plan and sanitary hydraulic designs of the selected alternative; 4) Executive Project of 1st stage works; 5) Bidding Documentation.

Metrobus 25 de Mayo highway

Type of work: Work inspection / Structural calculations review / Documentation review of new electrical installations / Hygiene and safety / Environment. 

a) Work linking the Boards: construction of the Linkage of the Boards of the 25 de Mayo Highway in order to generate an exclusive corridor for the circulation of passenger vehicles on the layout of said highway from PK 0 +630 to PK 8 + 000 (7,370 m). It included the replacement of new luminaires installed on the right lane of each direction of traffic, In the Section between the progressive PK 0+ 630 to PK 8 + 000; b) Viaduct Expansion Work: Expansion of the width of the current roads of the AU 25 de Mayo in the Center direction to be able to materialize the exclusive Metrobus lane from the Dellepiane toll embankment to Pillado street, intervening approximately 1,000 m of the Highway. The work included the review of the Contractor’s socio-environmental Management Plan and the monitoring of its implementation. From the Dellepiane toll embankment to Calle Pillado, intervening approximately 1,000 m from the Highway.

Subway line “B”: Lacroze – Villa Urquiza

Type of Work: Executive project. 

Executive project to extend Line B of the subways of the City of Buenos Aires by 3.6 km. The objective was to link the populous neighborhood of Villa Urquiza with the city center, with 3 intermediate stations, the last of which was connected to the Miter railroad tracks. The works included, among others: tunnels, stations, garage and underground rail grid, 8 transformation substations and the renewal of the signal system.

Infrastructure of the Country Club Abril

Type of work: Master Plan, study of alternatives, preliminary project and bidding project.

Drinking water: 4 boreholes, 2 elevated tanks of 100 m³ each and a 32 km distribution network and service with household connections to 1,400 lots with a design population of 6,000 inhabitants. Sewer drains: collector networks and collectors of 39 km. The effluents were treated by 2 treatment plants of the extended aeration type for 4,000 inhabitants each. Electric power: medium voltage network ringed to serve 1,400 properties, at 13.2 kV that feeds 9 S.E.T. 13.2 / 0.400 kV-1000 kVA. Exterior lighting system and road lighting network on the perimeter; weak current network for telephony, cable television; internal security and audio system. Sheets of general and particular technical specifications. Computation and budget.

Swift meat processing plant

Type of Work: Engineering review, monitoring and control of equipment manufacturing and construction management. 

Engineering review, monitoring and control of equipment manufacturing and construction management of a full cycle slaughterhouse-refrigerator, with the capacity to slaughter 1,440 cattle per day, enabled to export to the United States of North America and to member countries of the European Economic Community . The covered area of the plant is approximately 61,000 m².