Multipurpose Exploitation Nahueve

Type of work: Engineering Services for the review and approval of the detailed project and construction inspection. 

The contract includes the review of the detailed engineering and the inspection of all the civil works of the catchment, conduction channel, the loading chamber and its relief channel, the hydroelectric generation plant, the restitution channel and its corresponding accesses, the hydromechanical elements for its correct operation, such as bars, gates, cofferdams, penstock, overhead crane, lifting elements, electrical power and lighting installations, auxiliary, electrical and mechanical systems, etc. It also includes the 33 kV transmission line for interconnection to the Andacollo-Las Ovejas LMT and the assembly of all the consigned elements corresponding to the generation equipment, consisting of the turbines, generators, main transformers and their auxiliaries.

Michihuao Hydroelectric Development

Type of Work: Review and adaptation of the bidding documentation. 

Review and update of the documentation to tender the works of the Michihuao Hydroelectric Plant, 630 mW, located on the Limay River, between Pichi Picún Leufú and Lake E. Ramos Mexía, in Las Pcias. of Río Negro and Neuquén. The characteristics of the exploitation are: • Dam of loose materials, 7.7 km long. • Three generator sets of 210 MW each.

LEAT opening of 345 KV, Altiplano-Andes, La Puna Transfer Station and complementary works

Type of Work: Engineering Review and Inspection of Works 

The services include the completion and review of the detailed engineering, and the inspection of the works to be built, both civil and electromechanical, with the provision of equipment and all materials, as well as testing, commissioning. , operation and maintenance. These works are located on the southern margin of National Route 51, at approx. 20 km from Olacapato and 78 km west of the city of San Antonio de los Cobres, and they are carried out with the purpose of interconnecting the La Puna and Altiplano Solar Parks (Total power: 200 MW).

Drinking Water in Wichí

Type of Work: Project Review and Construction Supervision. 

The purpose of the work is to satisfy the demand for drinking water in a large area in the north of the Province of Chaco called “El Impenetrable”. The works to be carried out are: – Capture in the Bermejo River by means of a floating pontoon in the Pintado; – Raw water conduction until pre-treatment 90 m pipe A ° Ø 500 mm; – Aqueduct of pre-sedimentation water to Wichí HDPE D. 500 mm, length 7,713 m; – Elevator Station to the treatment plant in Wichí and to the Nueva Pompeya Mission, pumping capacity: 0.77 m³ / sec; – Treatment plant with slow filters in Wichí to supply Wichi and El Sauzal and complementary works. The hydroelectromechanical work has 13,500 m³ of concrete. The work includes reviewing the Contractor’s socio-environmental Management Plan and monitoring its implementation.

Carranza Tunnel

Name: Project review and inspection of the works at the crossing of Santa Fe – Cabildo Avenues, under the FC Mitre railway tracks.
Brief description: The works consisted of an underpass for 4 lanes of traffic, with a total length of 687 m, contemplating a railway bridge with 2 spans of 13.00 m each for 2 tracks, and two road bridges for Dorrego and Arévalo streets of 16.00 m span each.
Location: Autonomous City of Buenos Aires, Argentina.
Year: 1992-1995
Client: Subterráneos de Buenos Aires Sociedad del Estado (SBASE)

Urban Public Transport in the City of Corrientes

Type of Work: Direction and general coordination of the project, elaboration of the executive projects of the works. 

Review of the conceptual design prepared in 2010 and adjusted in 2014. Preparation of the executive project for the construction of the Chacabuco transfer station, intermediate stations, exclusive lanes for public transport on Av. 3 de Abril and preferential lanes in the central area. The work includes a socio-environmental impact study.

Metropolitan Transportation of the city of Posadas

Name: Feasibility study for integration terminals of the Integrated Transport System.
Brief description: An origin-destination survey was conducted in about 2,000 households in the municipalities of Posadas, Garupá, and Candelaria. In addition, traffic counts were carried out in specific areas. Transcad transport software was used. The transfer station and the exclusive lanes of the main access roads to it were designed. The work included a socio-environmental impact study.
Location: Province of Misiones, Argentina.
Year: 2010-2011
Client: Proyecto de Transporte Urbano para Areas Metropolitanas (PTUMA). Ministerio del Interior y Transporte.

Sewage Drainage System of the City of Añatuya

Name: Technical and environmental inspection of the work: Sewerage system of the city of Añatuya.
Brief description: The work consists of household collector networks and main collectors. Sewage lifting station and discharge pipe. 3 electric pumps of 30 kW each, ductile iron pipe connecting to a manifold, valves, gate, and screens. Wastewater treatment plant. Stabilization ponds. Disposal of treated liquids into a receiving body.
Location: Province of Santiago del Estero, Argentina.
Year: 2022-2026
Client: Secretaría de Infraestructura y Política Hídrica del Ministerio de Obras Públicas

National Route No. 81

Name: Executive project for National Route No. 81.
Brief description: The tasks included topographic survey, soil and material studies, environmental impact studies, geometric design, structural pavement design, drainage design, horizontal and vertical signage, descriptive report, metric calculations, price analysis and official budget, technical specifications, bidding documents, and offer form.
Location: Province of Salta, Argentina.
Year: 1997-2001
Client: Dirección Nacional de Vialidad.

Irrigation Canal Sarmiento

Name: Feasibility study and project for the rehabilitation of the General Sarmiento canal.
Brief description: Rehabilitation of the main irrigation canal called “Canal Sarmiento,” 16 km long and 14 m³/s, lined with concrete, various structures such as bridges: 3 dividers and several drops, including the evaluation of a mini-hydroelectric plant at its head.
Location: Province of San Juan, Argentina.
Year: 1998-1999
Client: Secretaría de Estado de Planeamiento y Control de Gestión. Unidad Ejecutora Provincial.