-
Client
Dirección Nacional de Preinversión - Ministerio de Obras Públicas de la Nación
-
Country
Argentina
-
Location
Pcias. of Córdoba and La Rioja
-
Area
Water Management - BIM
-
Year
2021-2022
Type of Work: Basic studies, Executive Project, Descriptive and Technical Report, Calculation and Budget, Preparation of Specifications and Technical Specifications for Bidding, Environmental Impact Assessments and Environmental Management Plan and Financial Economic Analysis.
– BIM modeling with LOD 300 scope of drinking water and sewage networks; Plant structures, pumping stations and complementary structures to the infrastructure.
– 3D coordination and interference analysis.
The executive projects of the drinking water systems (networks, home connections, study of sources, treatment, if necessary, storage, etc.) were carried out for the towns of Dean Funes (21,211 inhabitants) and Sañogasta (1,805 inhabitants). The executive project of the complete sewage system (networks, pumping stations, treatment plant, discharge to receiving body, etc.) for the town of Milagro (3,494 inhabitants) was developed.